Project Name: Reconfigure Classroom Building 800
Phase Type: 2009
Campus: 08 - Santana
Phase Status: Complete
Percent Complete: 100 %
Scope of Project: The scope of the new Building 800 encompasses designing a one-story with a mezzanine (17,070 sq. ft.) classroom building. The program consist of (10) classrooms (4 classrooms for lecture,1 Computer Drafting Lab, 1 Engineering/Materials Manufacturing Lab, 1 Metal Shop, 1 Electronics Lab, 1 Print Room, 1 Auto shop). The building will be designed to the current District Standards as to performance capabilities, and per Education Code and building codes (ADA compliance, Fire Life Safety, Structural). Site Preparation work consists of the demolition of existing building. The underground utility infrastructure (wet & dry) utilities will removed, rerouted, installed (as required or requested) consistent with the underground utilities infrastructure plan.
Budget: Project Complete
Schedule: Project Complete
Architect: Harley Ellis Devereaux
Construction Manager: 
Project Manager: 
Prop: Prop U